Physical infrastructure
Plan structured cabling, patch panels, racks and port labelling according to the agreed site scope.
A scoped implementation project covering the infrastructure your connected workplace needs.

Select the deliverables your business needs. Final scope and acceptance criteria are agreed in your quotation.
Plan structured cabling, patch panels, racks and port labelling according to the agreed site scope.
Install and configure agreed switches, gateways and access points, including VLANs and guest access where specified.
Agree the migration window, expected downtime, backup of existing configurations and rollback approach.
Validate agreed connectivity and coverage criteria. Provide the topology, inventory, configuration records and handover session.
Hardware, licenses, civil work and out-of-hours work are itemised separately when required.
Location, floors, users, devices, floor plans if available and existing equipment.
Your current issues, target opening or changeover date, budget range and priority applications.
Confirm deliverables, responsibilities, pricing, schedule and sign-off criteria.
Installation is coordinated around your site access, business hours and agreed migration window.
Confirm equipment, cable routes, rack space, power, access permissions and the approved design.
Complete the agreed cabling, labelling, installation and network configuration. Record changes as work progresses.
Check the agreed wired connectivity, wireless areas, network separation and required applications.
Review the delivered scope, documentation, support ownership and any outstanding actions together.
Use these as discussion points for the final project acceptance checklist.
| Area | Review together |
|---|---|
| Wired network | Agreed ports and uplinks connected, labelled and recorded |
| Wireless | Coverage checked in agreed rooms using agreed devices and conditions |
| Access separation | Guest and business network access follows the approved design |
| Business continuity | Migration steps, change records and rollback arrangements documented |
| Handover | Inventory, topology, configuration records and responsible contacts provided |
Start with your requirements. We will shape the scope around them.